Fixed signalling blocksControl logic dispersed along the routesLow integration of its individual partsDisparate technical solutions even within one single line DIVISION OF THE INTERLOCKING SYSTEMS Station interlocking system Track interlocking system Level crossing interlocking system speed limit due to the number of unprotected crossings Low usability of these facilities for other purposes Too much dependence on the human factor High cost of implementation 0 % Přejezdů pouze s výstražnými kříži Railway 4.0 Concept