Current state of secondary railway lines

  •  Fixed signalling blocks
  • Control logic dispersed along the routes
  • Low integration of its individual parts
  • Disparate technical solutions even within one single line
  •  
  • Speed limit due to the number of unprotected crossings
  • Low usability of these facilities for other purposes
  • Too much dependence on the human factor
  • High cost of implementation
0 %
Přejezdů pouze s výstražnými kříži