Implementation of the Railway 4.0 concept
The optimal procedure for infrastructure modernisation
- Creation of network plans with the exact location of all field elements
- points, detection devices, crossings, signals… = positions of object controllers
- radio network base stations
- Construction of backbone line infrastructure – optical and power lines
- lines must not restrict future infrastructure modifications and upgrades
- allows routine maintenance and modifications of the infrastructure
- Location of external technology elements – installation of object controllers and BTS
- less demanding in terms of space and costs compared to the current option with centralised control within the train station
solutions for level crossings
- connection of level crossing interlocking to linear infrastructure
- no need to connect to the energy network in the area
- moving the battery backup from the crossing location to more convenient power supply facilities in the train stations
- connection of detection devices via a fibre optic network – no additional costs for laying wires
- significant reduction in construction and operating costs – opportunity to significantly increase security at all level crossings
- secured level crossing allows increased train speeds – reduced journey times – increased attractiveness of the railway
Power supply
Voltage 400 V DC
- Reliable
- Lifetime up to 50 years
- cost-effective
- lower required electrical strength of materials
- smaller equipment
- sufficient for a distance of up to 7 km between neighbouring substations
- easy boosting and range extension if needed
- linear power lines along the entire network
- availability of a power source for all existing and future added technologies without the need to lay additional lines
- power supply in stations
- existing or easily upgradeable connections to the distribution network
- possibility of double-sided power supply
- redundancy
- lower demands on individual power nodes
Uniform interfaces of FIELD elements
- I/O definitions for individual types of controlled objects (switch, signal, warning device, …)
- simplification of design and installation
- configuration of the station by assigning addresses of individual elements in IZZ
- faster and cheaper modernisation process
Let’s not wait anymore.
- the defined target for the coverage of the entire railway network by ETCS and GSM-R is set at 2040
- part of this should be the implementation of the whole Railway 4.0 concept.
- investment actions of the “heavy” or “medium” repair type are very demanding in terms of time and money
- it is not realistic to meet the objective of building digital infrastructure only within the mentioned projects
- construction of line infrastructure for Rail 4.0. is relatively easy to prepare
- the benefits associated with the introduction of the new signalling method using IZZ can be in many places equal to the benefits resulting from extensive track modifications
- new technologies are more adaptive
- further adjustments during major infrastructure interventions will be easier
- line power and communication connection is available
- reconfiguration of the track means a simple intervention into the configuration parameters of the area for IZZ
- further adjustments during major infrastructure interventions will be easier